Off-peak EV charger rebate

Nodak Electric CooperativeNorth Dakotaup to 750 USD

A one-time rebate for Nodak members installing a new Level 2 electric vehicle charger on its load-control programme.

The rebate pays $50 per kilowatt, up to $750 per charger installation. Nodak issues a check after a technician visits.

The charging programme has an electricity rate of $0.069/kWh plus a $6.50 monthly facility charge. Charging hours are noon–5 p.m. and 11 p.m.–7 a.m. from October through May, and midnight–10 a.m. from June through September. Nodak can interrupt charging for up to 16 hours a day in winter or 20 hours in summer under certain circumstances.

Eligibility

  • You must be a Nodak member and participate in its EV load-control programme, which allows the cooperative to interrupt charging.
  • Install a new Level 2 charger on a dedicated 240-volt circuit. It must have separate metering and connect to a Nodak-issued load-control device.
  • Nodak serves all or parts of Pembina, Walsh, Ramsey, Nelson, Steele, Grand Forks, Griggs, Benson, Eddy, Traill and Cass counties in North Dakota; membership and a served installation are required, rather than simply living in one of those counties.

How to apply

Status
Open continuously
Round restrictions
  • Call Nodak’s Energy Service representative to enroll and apply.[^c4]

Call 1-800-732-4373 and ask for an Energy Service representative to enroll in the programme and apply for the rebate. A Nodak technician visits before the member’s rebate check is issued.

Official sources