DIY home insulation subsidy

Municipality of LeudalPaesi Bassi250–1,5K EUR

A grant for owner-occupiers in Leudal to buy materials for installing internal roof or floor insulation themselves.

Questa opportunità è attualmente disponibile in inglese.

This municipal grant covers new, unused insulation and necessary fixing materials for the existing parts of your home. For the base award covered here, it pays 100% of eligible material costs, including VAT, from €250 up to €1,500 per home. Your own working hours, installation by a company, secondhand materials, structural materials and general finishing materials are excluded.

You must install the insulation yourself and carry out the work properly. Internal roof insulation and (attic)floor insulation must have an Rd value of at least 3.5 m²K/W: the material’s resistance to heat flow, as stated by its supplier. Only work carried out from 1 September 2025 qualifies.

You may combine this grant with other subsidies, but support is calculated from costs you actually paid. Funding depends on the remaining €226,000 scheme budget.

Eligibility

  • You must own an existing house in Leudal and live there as your main residence. Apartments, houseboats and caravans do not qualify.
  • The covered homes have energy label D, E, F or G and a WOZ value for reference year 2022 strictly below €477,000. WOZ is the municipal assessed property value; provide that value in your application.
  • Your home must have a residential designation or permission for residential use, rather than a recreational designation. It must not be for sale when you apply or be put up for sale before the work is completed.
  • Only insulation of existing parts qualifies; work on a new extension, additional storey or dormer is excluded. When a project combines existing and new parts, separate their costs in quotations and invoices.
  • Your address must not already have received this municipal grant. The requested subsidy must be at least €250, and your information must be correct.
  • The work must be lawful, compatible with municipal policy and need the subsidy. The municipality may refuse profit-making activities or withdraw or change an award if the general refusal grounds later apply.

How to apply

Stato
Aperto continuamente
Restrizioni del bando
  • Complete applications are assessed in order of receipt while the €226,000 budget remains. Apply within eight weeks after completing the work if you did not reserve funding beforehand.
  • Applications began on 1 September 2025. The rules expire on 1 September 2028, so the last operative application day is 31 August 2028.

Apply to the municipality through the linked application form and sign in with DigiD. Complete applications are assessed in order of receipt until the budget is used up. You can apply before starting to reserve funding, or after completing the work, within eight weeks of completion.

For a reservation, complete the work within eight weeks after the grant is awarded. You may request one extension of four weeks. Then request final settlement within eight weeks after the last subsidised activity. A late settlement request allows the municipality to determine the award itself.

Provide the home’s construction year, its WOZ value for reference year 2022, energy label and insulation area. For final settlement, supply the supplier’s invoice, proof of payment, material type and Rd value or RVO product code, and at least one photo of each measure taken during installation showing the insulation. Allow a municipal inspector to inspect the work if requested. If your submission is incomplete, you have four weeks to supply the missing information.

For questions, contact cluster Duurzaamheid at (0475) 85 90 00 or duurzaam@leudal.nl.